Evidence through 28 September 2026
A ship can be ordered years before the ports on its route can reliably supply its fuel. In January 2026, Lloyd’s Register counted 1,942 alternative-fuel-capable vessels on order. Liquefied natural gas (LNG) accounted for the largest group and already had a sizeable bunkering network. Methanol had reached selected commercial hubs, while the report identified a single commercial ammonia bunkering operation by its September cut-off. The investment question for ports is which fuel they can deliver safely, repeatedly and at a volume that supports the cost of the service.
Ports can estimate bunker sales from which ships they expect to call, how often and where else those ships can refuel. Some gas carriers can burn their cargo, which weakens the link between orders for liquefied petroleum gas (LPG) and ethane carriers and demand for bunkering. Named vessels and agreed fuel volumes give ports a firmer basis for investment. (LR, pp. 6–9, 55–57)
| Fuel | 0–1,400 | Vessels |
|---|---|---|
| LNG | 1,259 | |
| Methanol | 385 | |
| LPG | 139 | |
| Ethane | 55 | |
| Hydrogen | 53 | |
| Ammonia | 45 | |
| Biofuel | 22 | |
| Nuclear | 4 |
Data from Lloyd’s Register’s analysis of Clarksons Research (p. 6). Fuel categories total 1,962 entries across 1,942 vessels because some ships can use more than one fuel.
Readiness varies by fuel and port
In January 2026, LNG bunkering was available at 222 ports and methanol at 25. Compatible bio-LNG and e-methane can use much of the existing LNG network. Biofuel blends can often move through conventional bunker supply chains, subject to fuel quality and compatibility checks. (LR, pp. 8, 10–13)
| Fuel and status | 0–250 | Count |
|---|---|---|
| LNG active | 222 | |
| LNG planned | 62 | |
| Methanol active | 25 | |
| Methanol in development | 23 |
Data from Clarksons Research and industry reporting (LR, pp. 5, 8). Development counts cover planned LNG port locations and methanol projects.
| Pathway | Evidence at the report cut-off | Port preparation |
|---|---|---|
| Biofuel blends | Commercial use through existing bunker networks. | Check blend quality, storage compatibility and sustainability documentation. |
| LNG | Established bunkering network. Bio-LNG and e-methane can use much of it. | Provide cryogenic storage, transfer systems and boil-off management. |
| Methanol | Commercial supply at selected ports. | Adapt compatible tanks and lines, then secure fuel supply and approvals. |
| Ammonia | One reported commercial operation. Other hubs were at pilot or authorisation stages. | Plan for toxic releases, protected transfer and a coordinated emergency response. |
| Hydrogen | Early harbour and short-sea applications. | Address storage, ignition risk and cryogenic handling for liquid hydrogen. |
| Nuclear | Port-access studies and early regulatory work. | Plan for vessel admission, security, emergency coordination and liability. |
Based on LR, pp. 10–17, 35–38, 48–49 and 59. Status reflects the report’s evidence cut-off.
Antwerp-Bruges completed early methanol transfers, with its last sales in the report’s records dating to the third quarter of 2024. In Singapore, alternative fuels accounted for 1.95 million of 56.77 million tonnes of bunker sales in 2025, about 3.4%. Biofuel blends and LNG made up most of that share. (LR, pp. 13, 26, 47, 60)
Methanol supply and ammonia milestones
Ports with chemical-handling experience can sometimes adapt compatible tanks, pipework and barges for methanol, which is stored at ambient temperature. In August 2026, Shanghai supplied a containership with 8,016 tonnes of biomethanol in a single operation. Scheduled service requires suppliers to deliver the agreed volume at a workable price on successive calls. (LR, pp. 13, 25, 58)
The production pipeline gives a sense of the supply risk. In June 2026, GENA Solutions tracked 284 projects representing 61.8 million tonnes per year of announced capacity by 2031. Its estimate for renewable methanol capacity in operation by the end of 2031 was 6–12 million tonnes per year. The announced pipeline includes a broader low-carbon category, and the operational estimate is limited to renewable production. A further GENA release cited by the report placed the same 61.8 million tonnes against a 2032 horizon. (LR, pp. 9, 13, 47)
Capacity in million tonnes per year
| Capacity by 2031 | 0–70 | Value |
|---|---|---|
| Announced project pipeline | 61.8 | |
| Expected operational renewable capacity | 6–12 |
E-methanol 24.7 Biomethanol 25.9 Other low-carbon methanol 11.2
Data from GENA Solutions and the Methanol Institute (LR, p. 13). The chart uses the June 2026 dataset and its 2031 horizon. The operational range covers renewable methanol.
Ammonia trials and commercial delivery
Rotterdam conducted a ship-to-ship ammonia pilot in April 2025. On 23 April 2026, Lotte Fine Chemical delivered approximately 600 tonnes of green ammonia from the pier to the gas carrier Antwerpen at Ulsan, for use in sea trials. Ulsan’s authorities described the transfer as the first commercial ammonia bunkering. Singapore’s trial authorisation took effect the following month, with demonstration bunkering planned for late 2027 at the time of the report. (LR, pp. 18, 26–27, 59–60)
Ammonia from different production pathways can use the same transfer equipment. Its lifecycle emissions depend on how it was made. (LR, p. 14)
Bunkering operations and safety
Truck-to-ship delivery can serve selected calls where road access and berth arrangements allow it. Bunker vessels can serve several berths, while fixed shore pipework ties delivery to specific berths. Each option needs a workable turnaround window and a trained team. A fuel import terminal, such as Kobe’s liquid hydrogen facility, requires separate arrangements to supply a ship’s fuel tanks. (LR, pp. 14, 27, 35, 53)
-
Fuel supply
Local production or imports -
Fuel staging
Port tanks or inbound delivery -
Bunker transfer
Barge, truck or shore pipe -
Receiving ship
Delivery at an approved berth
Port controls Authorisation, berth scheduling, emergency cover and custody records.
Based on LR, pp. 35–38, 43, 47 and 52–54.
Berth safety and emergency response
For ammonia, berth-specific dispersion modelling helps establish where a toxic cloud could reach and what space the port can keep clear. Hydrogen requires attention to ignition and, for liquid hydrogen, cryogenic exposure. Methanol brings toxicity and flammability risks, while LNG adds cryogenic handling and flammable gas. The report describes detection, rapid shutdown, coordinated drills, and procedures for simultaneous cargo and bunkering operations as measures shaped by the fuel and berth. (LR, pp. 35–38)
Lloyd’s Register places the shipboard boundary of the International Code of Safety for Ships Using Gases or Other Low-flashpoint Fuels, known as the IGF Code, at the ship’s bunkering connection. Applicable shore-side requirements come from the national or port framework. Compatible procedures across that connection matter for authorisation, emergency shutdown and incident response. Contracts and insurance also need to account for the potential harm from toxic or flammable releases. (LR, pp. 38–46)
Scheduling and delivery records
A shared schedule allows the berth operator, supplier and ship to check whether a bunker vessel, an exclusion zone and emergency cover can be available during the same window. Advance notifications document who is delivering, where and when. Metering and electronic delivery notes provide a common record of the quantity supplied and support reconciliation after the operation. (LR, pp. 52–54)
Investment tied to vessel demand
A bunker service has fixed costs even when few ships use it. Shore power offers a parallel. Portsmouth completed its system in late 2025, and use depended on reaching agreement with Brittany Ferries on electricity costs in summer 2026. The Tyne–IJmuiden green corridor links a proposed fuel supply chain to DFDS’s planned methanol passenger and vehicle ferries. The named vessels give the parties a basis for forecasting demand and allocating costs. (LR, pp. 5, 35, 50–51, 57)
Ports can benchmark each fuel against the International Association of Ports and Harbors’ Port Readiness Level tool. The nine levels span analysis, development and implementation. A port can use the benchmark to identify which approvals, skills and assets a fuel still requires and then test the business case against traffic on the relevant trade lane. One port may already sell biofuel blends, have methanol infrastructure under development and be assessing ammonia. (LR, pp. 18, 55–57)
- Assess
Map vessel demand, fuel supply and current port capability. - Prioritise
Choose fuels and sequence approvals and investment. - Invest
Secure financing, offtake and allocation of risk. - Implement
Authorise, train, exercise and conduct a controlled pilot. - Scale
Move to routine service as volume and reliability warrant.
Adapted from the Lloyd’s Register port readiness framework (pp. 55–57).
A shipowner evaluating a newbuild or conversion can check availability with suppliers at the actual ports of call, including alternative bunkering options if a regular call is missed. A port assessing a new fuel can make the same route-level check with its customers. Repeated calls, available fuel and an authorised transfer window determine whether early operations can support a lasting service. (LR, pp. 57–60)
Source and evidence date
LR refers to Lloyd’s Register (2026), Fuel for Thought: Ports. Expert Insights into the Future of Alternative Fuels. This article uses the supplied edition, which closed its evidence collection on 28 September 2026. Dates attached to figures identify the underlying data snapshots.